President John Dramani Mahama of the Republic of Ghana

No power supply interruption expected during Atuabo plant shutdown – Energy Ministry

No power supply interruption expected during Atuabo plant shutdown – Energy Ministry The Atuabo Gas Processing Plant is scheduled for a planned two-week shutdown for maintenance from August 16 to August 30, 2025. The Ministry of Energy and Green Transition has approved this maintenance shutdown to enhance the plant’s efficiency and safety systems. Despite the…

Read More